Turramurra
This job utilised Universal beams, parallel flange channels and square hollow sections. We initially site inspected this job for access and size. It was concluded that a scan using specific measuring equipment would need to be done by the detailer as to assure millimetre perfect placement of the steel.
BIO
During the installation we were able to bolt together some of the steel on the ground to form the ridge beams and lift up in one piece using a manitou. This job was all finished in primer as its all internal.
Get Your Custom Quote Today
Contact us for expert consultation and tailored solutions.