Seaforth
This job utilised PFC and SHS only. We measured this one then issued shop drawings for the client to approve.Due to the poor access on the site we had to join some of the beams back together once installed as they were too long for transport. This planning is done during the drawing phase so as to make the installation as easy as possible. The entire job was galvanised due to the proximity to the water.
BIO
This install was quite unique as we had to crane barge the steel to the property as there was no street access. The crane barge unloaded the steel onto the property but then we manually installed with Genie lifts